Prime Contractor

Don Moore WTP Fluoride Tank Replacement

Don Moore WTP Fluoride Tank Replacement
Don Moore WTP Fluoride Tank Replacement
Don Moore WTP Fluoride Tank Replacement
Don Moore WTP Fluoride Tank Replacement
Don Moore WTP Fluoride Tank Replacement

Don Moore WTP Fluoride Tank Replacement

Project Summary

Replacement of any existing failed fluoride bulk storage tank and repair & rehab of the damaged existing containment area. Included concrete rehab work and chemical resistant coating systems. Installation of a new fiberglass 8,000 gallon storage tank and reconnection to existing chemical feed piping systems.