Don Moore WTP Fluoride Tank Replacement
Project Summary
Replacement of any existing failed fluoride bulk storage tank and repair & rehab of the damaged existing containment area. Included concrete rehab work and chemical resistant coating systems. Installation of a new fiberglass 8,000 gallon storage tank and reconnection to existing chemical feed piping systems.