Roper WWTP EQ Lagoon Lining
Project Summary
An existing sewer equalization lagoon at a wastewater treatment had a ripped an failed geotextile liner. Cove removed the liner, removed and solidified residual sludge, regrading the lagoon, added an access ramp and then formed, reinforced and pours a concrete bottom and side slopes.