Flat Rock Creek Pump Station Rehab
Project Summary
Complete replacement of an existing large, utility scale sewer lift station. Included converting the existing drywell to a wet well with structural reinforcements and anti-corrosion lining system to build a submersible pump style lift station. Sewer flow was bypass pumped around the station for the duration of construction. Included new electrical, controls, piping/valving, backup diesel generator, cast in place retaining wall, painting and site paving.