Middle Branch WWTP Sludge Thickening
Project Summary
Improvements at an existing wastewater treatment plant constructing a new sludge thickening building. Featuring sludge conditioning and press equipment, interconnecting piping and electrical. Including a pre-engineered metal building on a cast in place concrete slab. Also included tie ins to existing active digester feed lines and thickened sludge holding tank onsite at the active wastewater treatment. Close coordination with the plant staff was necessary to avoid operational impacts.