Failed fluoride tank removal
Containment area concrete rehab
Chemical resistant coating application
New 8,000 gallon fiberglass tank installation
Chemical feed system reconnection
Completed fluoride storage system
WATER TREATMENT

Fluoride Tank Replacement

Complete fluoride storage system replacement and containment rehab

Project Details

DATE

2024

01

CLIENT NAME

Easley Combined Utilities, Easley, SC

02

PROJECT TYPE

Prime Contractor

03

Replacement of any existing failed fluoride bulk storage tank and repair & rehab of the damaged existing containment area. Included concrete rehab work and chemical resistant coating systems. Installation of a new fiberglass 8,000 gallon storage tank and reconnection to existing chemical feed piping systems.