Existing sewer lift station before rehab
Drywell to wet well conversion
Structural reinforcements installation
Anti-corrosion lining system
Submersible pump installation
Bypass pumping during construction
New electrical systems
Control panel installation
Piping and valving work
Backup diesel generator
Cast in place retaining wall
Site painting work
Paving completion
Final system testing
WASTEWATER TREATMENT

Pump Station Rehab

Complete utility-scale sewer lift station replacement

Project Details

DATE

2024

01

CLIENT NAME

Oconee Joint Regional Sewer Authority, Walhalla, SC

02

PROJECT TYPE

Prime Contractor

03

Complete replacement of an existing large, utility scale sewer lift station. Included converting the existing drywell to a wet well with structural reinforcements and anti-corrosion lining system to build a submersible pump style lift station. Sewer flow was bypass pumped around the station for the duration of construction. Included new electrical, controls, piping/valving, backup diesel generator, cast in place retaining wall, painting and site paving.

Share: