Failed geotextile liner removal
Sludge removal and solidification
Lagoon regrading and access ramp
Concrete bottom and side slope installation
WASTEWATER TREATMENT

Lagoon Lining

Complete lagoon rehabilitation with concrete lining system

Project Details

DATE

2024

01

CLIENT NAME

Pickens County, Liberty, SC

02

PROJECT TYPE

Prime Contractor

03

An existing sewer equalization lagoon at a wastewater treatment had a ripped an failed geotextile liner. Cove removed the liner, removed and solidified residual sludge, regrading the lagoon, added an access ramp and then formed, reinforced and pours a concrete bottom and side slopes.